1. dates in links

    Sometimes we want to refactor deep inside the core and we end up adding features because of mixed priorities (arghh). Anyway, I think the following features will prove to be quite useful:

    • support dates in links: this further improves what links can do (link an article to a calendar with a specific date for example).
    • support for calendar assignment: clic, clic, clic to create dated links.

    Example of an “assign” calendar: simply clic on empty spaces to set/remove a link at that date between two nodes (see calendar for details).

    I’ll create tons of nice videos to show these features at work… when the core refactoring (moving to rails 2.x) is done and we move out of beta.

    assign calendar

    Gaspard Bucher

    comments

    1. leave a comment